Kitchen Update
As of August 9, the Kitchen is operational! The floors are done, the cabinets are installed and awaiting shelving, the appliances work, and the homeowners are READY to move out of the basement! The only major thing left to do is seal the concrete countertops, which are currently covered in a plastic protector.
A huge thanks to Nacho, HandyManHotPants, and TeamHotPants for all their help this weekend!
HP01 assists the fellas with the concrete mixture
HandyManHotPants and HotNacho build the frame for the concrete countertops
HotSpeedo helps with the pour
A huge thanks to Nacho, HandyManHotPants, and TeamHotPants for all their help this weekend!
HP01 assists the fellas with the concrete mixture
HandyManHotPants and HotNacho build the frame for the concrete countertops
HotSpeedo helps with the pour
0 Comments:
Post a Comment
<< Home